Production line

Production line

original price: 85 000 USD
Hangzhou, China
Production capacity:
5 Set / Month
Hangzhou, China
Company
86-571-86303858
sheng yongxing
Contact person

Basic Information

A design based on 1. Name: LPG cylinder 2. Maximum workpiece size: 15 kg cylinder Φ320 × 680 3. Maximum workpiece weight: 20 kg 4. Spray annual processing capacity: 15 kg cylinder 180,000. 5. Working Hours: single-class system, working hours, 8 hours per day 6. Powders at 180 , the curing time of 20min 7. QXT-250/50-type suspension with conveyor chains, single-point load 20 kg, 250mm pitch 8. Line speed: Per 15 kg cylinder in the share of pipeline from the two pitch: 500mm; Single-class line speed:Second, bake Road Size 1. Bake Road Height: 2000mm 2. Bake Road Length: 13000mm 3. Bake Road Width: 1900mm 4. Bake Road wall thickness of 100mm, insulation cotton, aluminum silicate 3, oil furnace Oil furnace by the furnace, stainless steel heat exchanger, burner composed of imports. Hung Tao uses more than 200,000 calories burner, with an average fuel consumption of 10 kg per hour; Stainless steel heat exchanger is about 250 kg; Insulation materials: aluminum silicate, 40 kg per square meter, 4, high temperature fan and wind pipe, damper Fan cooling with circulating water temperature, air volume 7600 meters 3 / h 5, electronic control, temperature-controlled cabinet Intelligent temperature controller with touch, air switch, AC contactors, lights, switches and other low-voltage electrical company for the Chint. 6, spraying equipment 1. Powder Room: cavity length 4400mm × width 1500mm × high 2300mm 2. Collector fused with the powder room, using filter recycling, recycling air volume 5,000 m 3 / h, 5.5Kw 3. High-voltage generator 4 sets of 4 powder guns, fluidized bed for powder barrel 1. 7, QXT-250/50-type suspension Transportation Equipment Including: straight track, on the arch rail, the next scratch track, the horizontal guide rail, double-hinged chain, variable speed drives (1.5Kw), spring tension bodies, rotating spreader, frame and so on.

Delivery terms and packaging

Packaging Detail: wooden box Delivery Detail: 30days
Port: shanghai

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1

    Дата события:

    12.10.2016 - 18.10.2016
    Catalog
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product